TM 10-4320-345-13
4-18.
WATER METER ASSEMBLY REI'AIR - cont.
(10) Position gasket (7) and male coupling (6) on meter (15).
(11)
Install eight screws (5) and self locking nuts (4).
NOTE
Ensure packing is fully seated in groove of cap.
(12)
Install gasket (2) in cap (3).
(13)
Connect cap (3) to male coupling (6) with ring (1).
(14)
Install water meter assembly in water system (para 3-4b).
(15)
Startup water system (para 2-13c) and check water meter assembly for leaks.
14-19. NOZZLE STAND ASSEMBLY REPAIR.
This task consists of.
a.
Disassembly
b.
Cleaning
c.
Inspection
d.
Repair
e.
Assembly
INITIAL S ET-UP:
Tools:
Material/Parts:
General Mechanics Tool Kit (Item 1, App B)
Detergent, General Purpose (Item 1, App E)
Wiping Rag (Item 2, App E)
Cotter Pin (2) (Item 20, App I)
NOTE
Ensure that all parts identified as mandatory replacement parts are discarded and replaced with
new components
a.
Disassembly.
Refer to figure 4-10.
(1)
Unbend and remove S-hooks (1, 3 and 5) and disconnect chains (2, 4 and 6).
4-41