TM 10-4320-345-13
2-11. ASSEMBLY AND PREPARATION FOR USE-cont.
(14)
Connect 2 inch x 20 feet discharge hose (14) to Y-fitting (13).
(15)
Connect 1 1/2 inch distribution nozzle (15) to 2 inch x 20 feet discharge hose (14).
(16)
Connect 2 inch x 20 feet discharge hose (16) to Y-fitting (13).
(17)
Connect 1 1/2 inch distribution nozzle (17) to 2 inch x 20 feet discharge hose (16).
(18)
Unfold nozzle stand assembly (25) and hang 1 1/2 inch distribution nozzles (15 and 17) on
stand.
(19)
Connect 2 inch gate valve assembly (18) to Y-fitting (10).
(20)
Connect 2 inch x 20 feet discharge hose (19) to 2 inch gate valve assembly (18).
(21)
Connect Y-fitting (20) to 2 inch x 20 feet discharge hose (19).
(22)
Connect 2 inch x 20 feet discharge hose (21) to Y-fitting (20).
(23)
Connect elbow valve (22) to 2 inch x 20 feet discharge hose (21).
(24)
Connect 2 inch x 20 feet discharge hose (23) to Y-fitting (20).
(25)
Connect elbow valve (24) to 2 inch x 20 feet discharge hose (23).
(26)
Unfold nozzle stand assembly (26) and hang elbow valves (22 and 24) on stand.
2-12. INITIAL ADJUSTMENT.
a.
Hoses, Couplings and Valves.
(1) Verify that all quick disconnect couplings in the storage and distribution kits are securely
connected and locked.
(2) Verify that caps and plugs are installed on all open tees, fittings and hoses.
(3) Inspect all hoses for kinks. Straighten out kinks and tight bends.
(4) Verify that all gate valves and butterfly valves are closed.
b.
600 Gpm Pumps. Perform initial adjustments in accordance with the applicable TM.
c.
20K Collapsible Fabric Tanks. Perform initial adjustments in accordance with the applicable
TM.
d.
125 Gpm Pumps. Perform initial adjustments in accordance with the applicable TM.
e
Hvpochlorination Unit. Perform initial adjustments in accordance with the applicable TM.
2-62