TM 10-4610-234-13
Table 3-1. Operator Troubleshooting. (cont.)
Malfunction
Test or Inspection
Corrective Action
Step 6.
Step 7.
Step 8.
Step 9.
Inspect distribution nozzle control handle for damage. Verify that control handle works
smoothly.
If control handle is damaged or sticks, notify unit maintenance.
Verify correct setting of hypochlorination unit manifold valve (refer to TM
5-4610-233-13&P).
Check operation of 125 and/or 350 GPM water pumps.
Troubleshoot 125 GPM pump in accordance with TM 5-4320-304-14 or TM
10-4320-309-14.
Troubleshoot 350 GPM pump in accordance with TM 5-4320-226-14.
Check pressure regulator in 350 GPM pump connection kit for leaks.
If pressure regulator leaks, notify unit maintenance.
NOTE
If malfunction cannot be corrected, notify unit maintenance.
Section III. OPERATOR MAINTENANCE PROCEDURES
Page
Water System Component Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
3.3 WATER SYSTEM COMPONENT MAINTENANCE.
Operator maintenance on the 40K Water Distribution System hoses, valves, couplings, and fittings is limited
to daily inspections when the system is setup for use. Replacement of defective components requires the
services of unit maintenance. Refer to the following manuals for additional operator maintenance require-
ments,
Component
Technical Manual
125 GPM Pump
TM 5-4320-304-14 or TM 10-4320-309-14
350 GPM Pump
TM 5-4320-226-14
20,000 Gallon Collapsible Fabric Tank
TM 5-5430-226-12
Hypochlorination Unit
TM 5-4610-233-13&P
3-3/(3-4 blank)