TM 10 5430-240-13&P 0019 00
0019 00-1
OPERATOR, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
FILLER/DISCHARGE ASSEMBLY
INSPECTION, REPAIR AND REPLACEMENT
INITIAL SETUP
Tools
Tool Kit, General Mechanics
(Item 1, WP 0027 00)
Torque Wrench, 0-100 ft-lbs
(Item 2, WP 0027 00)
Materials/Parts
Brush, Scrub
(Item 5, WP 0034 00)
Detergent, General Purpose
(Item 3, WP 0034 00)
Rag, Wiping
(Item 4, WP 0034 00)
REMOVAL
Coupling Half
Unscrew and remove coupling half (1) from gate valve (2).
Pressure Gage
1. Remove pressure gage (3), elbow (4), drain cock (5) and pipe nipple (6) as an assembly from the gate
valve (2) flow tube.
2. Remove elbow (4), drain cock (5) and pipe nipple (6) from pressure gage (3).
Gate Valve
NOTE
It may be necessary to remove two more adjacent top and bottom pipe clamps
to remove gate valve.
1. Remove four cap screws and washers from top and bottom pipe clamps (7 and 8) and remove gate
valve (2) from tank.
2. Remove inside flange (9) from the gate valve (2) tube.
3. Remove two rubber adaptors (10).