TM 10 5430-240-13&P 0021 00
0021 00-3/4 blank
INSTALLATION
Eyebolt and Retainer Plates
Align top and bottom retainer plates (8 and 9) on semi-trailer bed or stake pocket. Insert eyebolt (3)
through retainer plates (8 and 9) and install washer (7), lock washer (6) and nut (5).
Tie-Down Strap Assembly
1. Install shackle (1) to D-ring (4) on each end of strap (2).
2. Position strap (2) on tank and attach shackles (1) to eyebolts (3) on semi-trailer.
END OF WORK PACKAGE