TM 5-4610-228-13
TM 08846A-13/1
c.
d.
e.
f.
g.
h.
i.
j.
NOTE
The side of the 125 GPM pump (13) with the male connector should face towards
the Hypochlorination Unit (item 7, figure 1-2).
Unroll hose assy (19) toward water tank (7).
Connect gate valve assy (4) to suction hose assy (21). Unroll hose assy toward water tank (7).
Connect suction hose assy (21) to female to male reducer (1).
Position gate valve and tee assy (8) so that male end of tee assy connects female to male reducer (1).
Connect gate valve end of gate valve and tee assy (8), nearest the water tank (7) suction hose assy (19).
Connect suction hose assy (19) to connector on water tank (7).
Assemble second gate valve (8), on gate valve and tee assy (8), in the same manner.
Connect male end of suction hose assy (16) to gate valve assy (8).
2-10