TM 5-4610-228-13
TM 08846A-13/1
i. Connect gate valve assy (20) to discharge hose assy (21).
j. Connect reducer (22) to discharge hose assy (21).
k. Position Hypochlorination Unit next to tee assy (14) on the discharge side of 350 GPM pump assy and
connect.
NOTE
Remove protective paper and tape from female end of Hypochlorination Unit
and attach to male end of tee assy (14). Remove protective paper and tape from
male end of Hypochlorination Unit and attach to female end, plug removed, of
tee assy (14).
2-9.2.4 Assemble Nozzle Connection Kits
a. Connect tee assy (14) to discharge hose assy (17).
b. This is followed by another hose connected in the same manner.
c. Connect hose assy (17) to tee assy (14).
d. Connect tee assy (14) to reducer (18).
2 - 2 4