2-2.
DEPLOYMENT (Continued)
a.
b.
c.
Remove tank roll from shipping container.
Position tank in the center of the lower end (down slope) of the
deployment site (Figure 2-1).
Unroll tank towards the higher end (up slope). This will place the
drain assembly on the lower side.
Figure 2-1.
Tank Rolled
2-2