TM 10-4130-237-14
5-28. TRAILER MOUNTING KIT INSTALLATION (CONT)
10 Place water chiller cradle on trailer chassis with rear legs of cradle placed firmly against the back side
of the manifold pipe.
11 Weld water chiller cradle to trailer chassis.
12 Install eyebolts from end of load binders in eyebolt brackets.
13 Install two flatwashers, spring, and two nuts on each load binder eyebolt.
To prevent injury, four persons are required for next step.
14 Using four people to lift, install water chiller in cradle with bottom of skid in lock position at rear of
cradle.
15 Place grab hooks from load binders over flange of front skid and place load binder in lock position.
5 - 8 8