TM 10 4320-303-13SECTION II. DIRECT SUPPORT MAINTENANCE PROCEDURES5.4 10 MILE SEGMENT EQUIPMENT.5.4.1 FlakingBoxAssemblyRepair.This task covers:5.4.1.1 RepairINITIALSETUPEquipmentConditionsGeneralSafetyInstructionsHoseline Segment removed from flakingDo not work on equipment that is not secure-box assembly.ly stabilized to prevent sliding.Do not work on equipment without followingstandard shop safety precautions.5.4.1.1 Repair.WARNINGDo not work on equipment that is not securely stabilized to prevent sliding. Failureto do so may result in personal injury.NOTENewer model flaking boxes can hold two 500 foot hose assemblies. Older modelflaking boxes can hold only one 500 foot hose assembly.a. Repair of the flaking box assembly consists of welding cracked seams and frame members inaccordance with MIL-STD-1261 and TM 9-237.5-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business