TM 10 4320-303-13
SECTION II. DIRECT SUPPORT MAINTENANCE PROCEDURES
5.4 10 MILE SEGMENT EQUIPMENT.
5.4.1 Flaking Box Assembly Repair.
This task covers:
5.4.1.1 Repair
INITIAL SETUP
Equipment Conditions
General Safety Instructions
Hoseline Segment removed from flaking
Do not work on equipment that is not secure-
box assembly.
ly stabilized to prevent sliding.
Do not work on equipment without following
standard shop safety precautions.
5.4.1.1 Repair.
WARNING
Do not work on equipment that is not securely stabilized to prevent sliding. Failure
to do so may result in personal injury.
NOTE
Newer model flaking boxes can hold two 500 foot hose assemblies. Older model
flaking boxes can hold only one 500 foot hose assembly.
a. Repair of the flaking box assembly consists of welding cracked seams and frame members in
accordance with MIL-STD-1261 and TM 9-237.
5-3