TM 10-4320-303-13
P (Continued)
Pressure Relief Valve Assembly
Maintenance....................................4.11.6
Procedures for Preparation
for Movement of TWDS......................... 2.8.1
Procedures, Operating........................... 2.5
Pillow Tank, 20,000 Gallon
Equipment Data for ......................... 1.17.2
Pull Board Assembly Repair .................. 4.16.2
Pumping Assemblies, Trailer
Mounted, Equipment Data for ......... 1.17.1
Pumping Assembly, 125 GPM
Equipment Data for ......................... 1.17.3
Pumping Assembly, 125 GPM,
Maintenance, Operator.................... 3.6
Pumping Station, Boost, Assembly........ 2.3.5
Pumping Station, Boost,
Operator's Controls and
Indicators for ...................................2.1.3
Pumping Station, Boost,
Preparation for Movement of .......... 2.8.4
Pumping Station, Lead Assembly.......... 2.3.4
Pumping Station, Lead, Operation of.....2.5.2
Pumping Station, Lead,
Operator's Controls and
Indicators for ...................................2.1.1
Pumping Station, Lead,
Preparation for Movement of........... 2.8.3
Pumping Station Maintenance,
Operator.......................................... 3.3
Pumping Station Spacing, TWDS
Site Location and............................. 2.3.1
Pumping Stations, Functional
Description of ..................................1.19.1
Q
Quality Assurance (QA)......................... 1.5
R
Reducer Y-Connection
Maintenance....................................4.10.1
Removal and Installation,
Grooved Pipe Coupling ................... 2.3.2
Removal and Installation,
Grooved-End Pipe Quick
Disconnect Coupling Clamp................... 2.3.3
Repair, 6 Inch Hose Assembly............... 3.4.1
Repair, Flaking Box Assembly .............. 5.4.1
Repair, Hypochlorination Unit
Frame Assembly ............................. 5.6.5
Repair Kit Maintenance ......................... 4.17
Repair, Main Valve Assembly ................ 5.5.2
Repair Parts, Direct Support
Maintenance....................................5.3
Repair Parts, Unit
Maintenance....................................4.3
Repair, Pressure-Reducing Control........ 5.5.1
Repair, Pressure-Reducing
Valve Assembly Skid
Assembly........................................ 5.5.3
Repair, Pressure Regulating
Valve .............................................. 5.6.4
Repair, Pull Board Assembly................. 4.16.2
Replacement, Collapsible Hose
Assembly, 6 Inch x 500
Foot ................................................ 4.11.1
Replacement, Fill Assembly .................. 4.13.3
Replacement, Frame Assembly ............ 4.13.8
Replacement, Hose Assembly............... 4.10.3
Replacement, Pressure Gauge
Assembly........................................ 4.13.3
Replacement, Pressure-Reducing
Valve Assembly .............................. 4.11.4
Replacement, Pressure Regulator
Valve .................................................... 4.13.7
Replacement, Swivel Joint .................... 4.11.3
Replacement, Water Meter and
Gear Box Assembly ........................ 4.13.5
Replacement And Repair,
Hypochlorination Unit, Model
1955-1 ............................................ 4.13.1
S
Safety, Care, and :Handling.................. 1.9
Scope ................................................... 1.1
Segment, Hoseline, 10-Mile,
Functional Description of ................ 1.19.3
Segment, Hoseline, 10-Mile,
Operator Maintenance of ................ 3.4
Service Upon Receipt of
Materiel........................................... 4.4
Siting and Location................................ 4.4.1
Sling Assembly Maintenance ................ 4.18
Special Instructions,
Operator PMCS .............................. 2.2.4
Special Instructions,
Unit PMCS...................................... 4.8.2
Special Tools and Support
Equipment, Direct Support
Maintenance ................................... 5.2
Special Tools, TIDE, and
Support Equipment, Unit Maintenance.. 4.2
Stand Assembly Maintenance............... 4.13.9
Stations, Pumping, Functional
Description of.................................. 1.19.1
Storage ................................................. 4.22
Storage, Administrative......................... 4.23
Storage Assemblies, Assembly of......... 2.3.6
Storage Assemblies, Operation of......... 2.5.4
Storage Assemblies, Preparation
for Movement of ............................. 2.8.5
Storage Assembly, :Failure of ............... 2.12.3
Storage Assembly, :Functional
Description of.................................. 1.19.2
Storage Assembly Maintenance,
Operator ......................................... 3.5
Storage Assembly Maintenance, Unit.... 4.12
INDEX-4