Home
Download PDF
Order CD-ROM
Order in Print
EXPLANATION OF COLUMNS IN TOOL AND TEST EQUIPMENT REQUIREMENTS, SECTION III - TM-10-4320-346-12P_61
Section III. SPECIALS TOOLS AND TEST EQUIPMENT REQUIREMENTS
TM-10-4320-346-12P Forward Area Water Point Supply System Model LAB 9095 NSN 4320-01-369-0369 Manual
Page Navigation
44
45
46
47
48
49
50
51
52
53
54
TM 10-4320-346-12&P
Section II. MAINTENANCE ALLOCATION CHART
FOR
FORWARD AREA WATER POINT SUPPLY SYSTEM.
00
Forward Area
Water Point
Supply System
01
Hose Assemblies
Inspect
0.2
Replace
0.2
A
Repair
1.0
1, 2, 3
02
Ball Valve
Inspect
0.2
Assemblies
Replace
0.2
A
Repair
1.0
1, 2, 4
03
Nozzle
Inspect
0.2
Assemblies
Replace
0.3
A
Repair
1.0
1, 2, 4
04
Nozzle Stand
Inspect
0.2
Assemblies
Replace
0.3
A
Repair
1.0
1
05
Towing and
Inspect
0.2
Lifting Yokes
Replace
0.3
A
Repair
1.0
1
06
Miscellaneous
Inspect
0.2
Fittings
Replace
0.3
A
Repair
0.4
B
07
Fabric Drums
C
08
Pumping
D
Assembly
B-4
(5)
TOOLS
AND
EQUIP
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
(4)
MAINTENANCE LEVEL
UNIT DS GS DEPOT
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business