TM 10-4610-237-12
2.9
OPERATING PROCEDURES - Continued.
Discharge Mode. Refer to Figure 2-9.
(5)
Open gate valves V5, V6 and V4.
(6)
Open tank outlet gate valve V2.
CAUTION
The 125 gpm pump volute must be filled with water before operating. Damage to the pump can
occur.
(7)
Start and operate 125 gpm pump. Refer to the applicable TM.
(8)
At hypochlorination unit make final adjustments. Refer to the applicable TM.
(9)
To dispense water through 2-inch hose connection kit, proceed as follows:
(a)
Remove cap and connect end of dispensing hose to water storage container.
(b)
Open gate valve V7.
(c)
When water storage containers are full, close gate valve V7 and disconnect dispensing hose
from water storage container.
(10) To dispense water through hose nozzle connection kits, proceed as follows:
(a)
Open gate valves V8, V9, V10 and V11.
(b)
Place distribution nozzles in water storage containers and squeeze distribution nozzle control
handles to dispense water.
(c)
When water storage containers are full, release control handles on distribution nozzles.
(d)
Close gate valves V8, V9, V10 and V11 and remove nozzles from water storage container.
(11) When discharge mode is complete, shut down the 125 gpm pump (refer to the applicable TM).
d.
Shutdown. Refer to Figure 2-9.
(1)
Shut down 125 gpm pump. Refer to the applicable TM.
(2)
Close gate valves V1 through V11 (if open).
(3)
Shut down hypochlorination unit. Refer to the applicable TM.
2-28