TM 5-5430-211-13 & P
3-14
FILLER ASSEMBLY-CONTINUED
ITEM
ACTION
REMARKS
INSTALLATION
1.
Coupling
Place the coupling half (10), the
The epoxy-polyamide
Assembly
composition gaskets (11), oval
primer prevents
closure plate (12) and suction stub
electrolytic corrosion.
(13) so that their holes are
aligned. Coat the bolts (8),
washers (14) and nuts (15) with a
thin film of epoxy-polyamide
primer coating.
Replace a 1.5 inch bolt (8) with
thread seal (9) through one of the
holes.
Put the lock washer (14) on the
bolt.
Put the nut (15) on the bolt a few
turns only.
Replace the other bolts, seals,
washers and nuts.
Tighten all bolts finger tight only.
3-33