4-13.
HOSE ASSEMBLY.
a.
Disassembly of 4 Hose
(1) Drain tank.
(2) Disconnect hose from Filler/Discharge Assembly by pulling coup-
ling cam arms outward.
(3) Disconnect hose from Valve Assembly by pulling coupling cam arms
outward.
b.
Disassembly of Drain Hose
(1) Refer to paragraph 4-11, a. steps (4) and (5).
c.
Replacement
(1) Unpack new hoses and check couplings for serviceable gaskets.
d.
Reassembly of 4 Hose
(1) Clean Filler/Discharge Assembly coupling.
(2) Connect mating hose connections. Push both cam arms closed at
the same time.
(3) Connect Valve Assembly to other end of hose. Push both cam arms
closed at the same time.
e.
Reassembly of Drain Hose
(1) Refer to paragraph 4-11, c. steps (1) and (2).
4-14.
PERFORMANCE VERIFICATION.
The only performance verification for the
20,000 Gallon Collapsible Water Tank is a visual inspection of the part or
parts that have been repaired.
If the procedures in this manual do not
repair the equipment, notify your supervisor.
4-22