TM 5-3895-370-14&P
5-47. DECK PLATE REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's: automotive
TM or Para
Condition Description
Para 4-40
Fuel tank removed.
Materials/Parts
Para 4-144
Hydraulic tank removed.
Lockwashers (24)
Para 4-161
Flushing tank removed.
Para 4-122
Fender supports
Personnel Required
removed.
MOS63W, Wheel vehicle repairer (2)
Para 4-152
Control console
removed.
Para 4-125
Hand sprayer and hose
stowage racks removed.
Para 4-124
Rear bituminous hose
stowage rack removed.
Para 5-54
Bituminous pump base
removed.
a. Removal.
(1)
With aid of assistant, remove six nuts (1),
lockwashers (2), washers (3), screws (4), and
rear deck plate (5) from main frame (6). Discard
lockwashers.
(2)
With aid of assistant, remove six nuts (7),
lockwashers (8), screws (9), and middle deck
plate (10) from main frame (6). Discard
lockwashers.
5-159