TM 10-3835-223-13&P
4-12. POWER PACK GUARD REPLACEMENT.
This task consists of:
a. Removal
b. Installation
INITIAL SET-UP:
Tools required:
Tool Kit, General Mechanics, Automotive (Appendix B, Section III, Item 1)
Equipment Condition:
Power pack removed from frame unit (para. 2-8a).
a.
b.
Removal
(1)
Remove eight screws (1) and washers (2).
(2)
Lift guard (4) from power pack frame (3).
Installation.
(1)
Position replacement guard (4) over power pack frame (3) and aline screw holes.
(2)
Install eight washers (2) and screws (1).
4-18