TM 10-4130-237-14
5-6.
CYLINDER BLOCK ASSEMBLY REPLACEMENT (CONT)
6
Install governor shaft lever nut and flatwasher. Torque locknut to 100 in.lb (11.3 Nm).
7
Install front shield. Install four front shield mounting bolts.
8
Install exhaust manifold assembly (pm 4-18).
9
Install flywheel and ring gear assembly (para 4-28). DO NOT install blower housing.
10 Install armature group (para 4-25). DO NOT install blower housing.
11 Install starter (para 4-27).
12 Install cylinder head assemblies (para 5-5).
13 Install intake manifold assembly (para 4-22).
14 Install carburetor assembly (para 4-21).
15 Install dipstick and tube assembly (para 4-26).
16 Install pulley drive assembly (applicable to water chillers, Model LCW-2685) (para 4-16).
16.1 Install centrifugal clutch (applicable to water chillers, Model LCC-2685 only) (para 417).
17 Install fan assembly (para 4-15).
18 Install engine assembly (para 4-19).
5-7.
REFRIGERATION SYSTEM LEAK-TEST
This task covers:
a. General Instructions
b. Electronic Gas Detector Method
INITIAL SETUP
Equipment
Condition
Para
Condition Description
5-2
Engine stopped power
disconnected, fuel line
disconnected, muffler and
housing removed.
c. Soap Solution Method
Tools
Refrigeration Unit Semite Tool
KiL item 5, appendix B
5-27