TM 10-4320-345-13
4-6. CHECKING UNPACKED EQUIPMENT.
a.
General. The water system is packaged and shipped in four TRICONs and 64 flaking boxes.
Component parts required to assemble the pump stations, storage and distribution points and connect
the hoseline segments are stored in the TRICONs. The 600 gpm pumps, 125 gpm pumps,
hypochlorination units, and 20K collapsible fabric tanks are separately packaged and crated. Where
possible, save crating inside the TRICON for reuse to make repacking easier. When unpacking the
equipment, keep in mind that the system is made up of different connection kits. This manual
addresses installation and use of all connection kits, but you may not need all of these components to
perform your mission. Your operating requirements will determine which connection kits/components
are needed to perform the mission.
b.
Unpack 20K Collapsible Water Tanks. Refer to Applicable TM to unpack the water tanks.
c.
Unpack 600 Gpm Pumps. Refer to applicable TM to unpack the 600 gpm pumps.
d.
Unpack 125 Gpm Pumps. Refer to applicable TM to unpack the 125 gpm pumps.
e.
Unpack Hypochlorination Units . Refer to applicable TM to-unpack the hypochlorination units.
f.
Checking Unpacked Equipment.
(1)
Inspect equipment stencils, markings and information plates. All items should be clear and
readable
(2)
Inspect the equipment for any damage incurred during shipment If the equipment has been
damaged, report the damage on SF 364, Report of Discrepancy
(3)
Inspect components to make sure they are in serviceable condition.
(4)
Check equipment against the packing slip to see if the shipment is complete. Report all
discrepancies in accordance with the instructions of DA Pam 738-750.
(5)
Check to see if the equipment has all applicable MWOs incorporated.
g.
Processing Unpacked Equipment
(1)
Remove all tape, paper wrapping, plastic sheeting and packing materials from the water system
components.
(2)
Refer to the applicable TM for processing and servicing the 600 gpm pumps.
(3)
Refer to the applicable TM for processing and servicing the 125 gpm pumps.
(4)
Refer to the applicable TM for processing and servicing the hypochlorination units.
(5)
Refer to the applicable TM for processing the 20K collapsible fabric tanks.