TM 10-4320-345-13
2-11. ASSEMBLY AND PREPARATION FOR USE - cont.
NOTE
Keep empty flaking boxes and tailgates for reuse.
(28)
Repeat steps (4) through (27), except step (25) until enough hose has been deployed to
reach next downline boost pumping station Make sure swivel joints are installed every
1,000 feet. As required, refer to para 2- 11h and 2-11
i to install roadway crossing guards
and suspension kits along installation route.
Connect Boost Pumping Stations. Refer to figure 2-22.
NOTE
As each boost pumping station is reached, snake hose as required to lake
up slack in hose.
(29)
As each boost pumping station is reached, connect trailing end of deployed hose (1) to
suction lateral fitting (3) with coupling clamp (2).
(30)
Connect leading end of flaked hose (4) to discharge lateral fitting (6) of boost pumping
station with coupling clamp (5). Continue laying hose to next boost pumping station.
(31)
Repeat steps (29) through (31) until all boost pumping stations are connected to the
hoseline.
Figure 2-22. Boost Pumping Station Connection
2-49