TM 10-4610-237-12
Section II. MAINTENANCE ALLOCATION CHART
00
20,000 Gallon Water
Storage and
Distribution System
01
Hose Nozzle
Connection Kit
0101
Distribution Nozzle
Inspect
0.1
(11/2-inch)
Replace
0.2
Repair
0.5
1,2,3
0102
Discharge Hose,
Inspect
0.1
1 1/2-in. x 25 ft
Replace
0.2
Repair
1.0
1, 2, 3
0103
Discharge Hose,
Inspect
0.1
2 in. x 20 ft.
Replace
0.2
Repair
1.0
1,2
0104
Gate Valve, 2-inch
Inspect
0.1
Replace
0.2
Repair
1.5
1, 2, 4
0105
Tee Assembly
Inspect
0.1
(9117-YI)
Replace
0.2
Repair
1.0
0106
Discharge Hose,
Inspect
0.1
4-in. x 20 ft.
Replace
0.2
Repair
1.0
1, 2, 3
0107
Nozzle Stand
Inspect
0.1
Assembly
Replace
0.2
Repair
1.5
1
02
2-Inch Hose
Connection Kit
0201
Discharge Hose,
Inspect
0.1
2-in. x 20 ft.
Replace
0.2
Repair
1.0
1,2,3
0202
Gate Valve, 2-inch
Inspect
0.1
Replace
0.2
Repair
1.5
1,2,4
MAINTENANCE LEVEL
(5)
TOOLS
AND
EQUIP.
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
UNIT
DEPOT
GS
DS
B-4