TM 10-4610-237-12
Section II. MAINTENANCE ALLOCATION CHART
0203
Tee Assembly,
Inspect
0.1
4-inch (91 17-YI)
Replace
0.2
Repair
1.0
1
0204
Discharge Hose,
Inspect
0.1
4 in. x 20 ft.
Replace
0.2
Repair
1.0
1, 2, 3
0205
Nozzle Stand
Inspect
0.1
Replace
0.2
Repair
1.5
1
03
Hypochlorination
A
Unit
04
125 GPM Pump
Connection Kit
0401
Discharge Hoses,
Inspect
0.1
2-in. x 20 ft.
Replace
0.2
Repair
1.0
1,2,3
0402
Gate Valve
Inspect
0.1
Assembly, 2-inch
Replace
0.2
Repair
1.5
1,2
0403
Check Valve,
Inspect
0.1
2-inch
Replace
0.2
Repair
1.0
1,2,4
0404
Suction Hoses,
Inspect
0.1
2-in. x 20 ft.
Replace
0.2
Repair
1.0
1, 2,3
05
Pump Assembly,
A
125 GPM
06
Single Tank
Connection Kit
0601
Discharge Hoses,
Inspect
0.1
4-in. x 10 ft. and
Replace
0.2
4-in. x 20 ft.
Repair
1.0
1,2,3
0602
Tee and Dual Gate
Inspect
0.1
Valve Assemblies,
Replace
0.2
4-in. (9148-YI, Y2)
Repair
2.0
1, 2
MAINTENANCE LEVEL
(5)
TOOLS
AND
EQUIP.
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
UNIT
DEPOT
GS
DS
B-5