TM 10-4610-237-12Table 2-1. Operator Preventive Maintenance Checks and Services for Model 2OKWSDS - Continued.125GPMPUMPCONNECTIONKIT15BeforeSuction anda.Inspect for cuts, tears and deepHoses cut or torn.Discharge Hosesabrasions.Couplings cracked orb.Inspect for cracked and bent orbroken.broken couplings.c.Check for and straighten kinkedhoses.16BeforeGate Valvesa.Inspect for loose, broken, or missingValve cracked, broken or(2-inch)hand wheel. Rotate hand wheel.stuck.Valve should turn freely.b.Inspect valve body for cracks andexternal damage.17BeforeCheck ValveInspect valve body for cracks andValve cracked or broken.external damage.18Before125 GPM PumpPerform "BEFORE" PMCS contained inapplicable TM.ITEMNO.IntervalLocationItems toCheck/ServiceNot Fully MissionCapable If:Procedures2-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business