TM 10-4610-237-12
Table 2-1. Operator Preventive Maintenance Checks and Services for Model 2OKWSDS - Continued.
39
After
Check Valve
a.
Inspect quick disconnect couplings
for damage and missing gasket, caps,
or plugs.
b.
Inspect for missing attaching bolts,
nuts, and hardware.
40
After
Water Tank Chest
Perform "AFTER" PMCS contained in
the applicable TM.
41
After
125 GPM Pump
Perform "AFTER" PMCS contained in
the applicable TM.
42
After
20K Collapsible
Perform "AFTER" PMCS contained in
Fabric Tank
the applicable TM.
43
After
Hypochlorination Unit
Perform "AFTER" PMCS contained in
the applicable TM.
44
After
Triple Container
Perform "AFRER" PMCS contained in
the applicable TM.
ITEM
NO.
Interval
Location
Items to
Check/Service
Not Fully Mission
Capable If:
Procedures
2-14