TM 10-4610-237-122.12 PREPARATIONFORMOVEMENT-Continued.f.Packing.(1) Open triple container. Refer to the applicable TM.(2) Pack water system components into triple container. If possible, keep similar components stowedtogether. For example, pack all 4inch discharge hoses together, then all the 2-inch gate valves, 2-inchdischarge hoses and so on until all components are stowed.(3) Pack hypochlorination unit into triple container.(4) Pack 125 gpm pump into triple container.(5) Close triple container. Refer to the applicable TM.2-39
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business