TM 10-4610-242-132-15. PREPARATION FOR MOVEMENT- cont.l.DisassembleDualTankConnectionKitAssembly.Each connection kit has been a assigned a kit number.Components in kits 5 through 8 are positioned differently (opposite) kits 1 through 4 to allow interconnection of allkits at the 350 gpm pump connection kit tees. Refer to figure 236, sheet 1, to disassemble kits 1 though 4.Refer to sheet 2 to disassemble kits 5 through 8.WARNINGTo prevent contamination of water system components, keep dirt mud, sand, and debris from enteringopen couplings during disassembly. Make sure protective caps and plugs are installed after componentsare disassembled.Disassemble Kit No 1,2,3, and 4. Refer from figure 2-36, sheet 1.(1)Disconnect 20 foot discharge hose (17) and 10 foot discharge hose (18) from tee and gate valve assembly(16).(2)Disconnect tee and gate valve assembly (16) from discharge hose (14).(3)Disconnect 20 foot discharge hose (14) from female discharge elbow (15) on water tank (19).(4) Disconnect 20 foot discharge hose (I 2) and 10 foot discharge hose (13) from tee and gate valve assembly(11).(5)Disconnect tee and gate valve assembly (11) from discharge hose (9).(6)Disconnect 20 foot discharge hose (9) from female discharge elbow (10) on water tank (20).(7)Disconnect 10 foot suction hose (8) from tee and gate valve assembly (5).(8)Disconnect 20 foot suction hose (7) between tee and gate valve assemblies (5and 6).(9)Disconnect tee and gate valve assembly (6) from suction hose (3).(10)Disconnect tee and gate valve assembly (5) from suction hose (1).(11)Disconnect 20 foot suction hose (3) from male discharge elbow (4) on water tank (20).(12)Disconnect 20 foot suction hose (1) from male discharge elbow (2) on water tank (19).Disassemble Kit No 5, 6, 7, and 8 Refer to figure 2-36, sheet 2.(13)Repeat steps (1) through (12) for kits 5, 6,7, and 8.(14)Drain and allow components to dry.(15) Install caps and plugs on component couplings (para 2-10c).(16)Roll up all discharge hoses and secure with tape.(17)Prepare all 20K collapsible fabric tanks for movement Refer to the applicable TM.2-89
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business