(16) To dispense water through hose nozzle connection kits, proceed as follows:
(a)
Open gate valves V15, V16, V17 and V18.
(b)
Place distribution nozzles in water storage containers and squeeze distribution nozzle control
handles to dispense water.
(c) When water storage containers are full, release control handles on distribution nozzles.
(d)
Close gate valves V15, V16, V17 and V188.
(17) To dispense water through hose and nozzle connection kits, proceed as follows:
(a)
Open gate valves V19, V20 and V21.
(b)
Place distribution nozzles in water containers and squeeze distribution nozzle control handles to
dispense water.
(c) When water storage containers are full, release control handles on distribution nozzles
.
(d) Close gate valves V19, V20 and V21.
(18) When discharge mode is complete, shutdown 350 gpm pump P3 (refer to the applicable TM) and 125 gpm
pump P4 (refer to the applicable TM).
d
Shutdown Refer to figure 2-24.
(1)
Shutdown- 350 gpm pump P1 Refer to the applicable TM.
(2)
Shutdown 125 gpm pump P2 Refer to the applicable TM.
(3)
Close gate valves V1, V2, V3 and V4.
(4)
Shut down hypochlorination unit H1 Refer to the applicable TM.
(5)
Close water tank inlet gate valves T1A through T16A.
(6)
Close water tank outlet gate valve T1B through T16B.
(7)
Shutdown 350 gpm pump P3 Refer to the applicable TM.
(8)
Shutdown 125 gpm pump P4 Refer to the applicable TM.
(9)
Close gate valves V5, V6, V7 and V8.
(10) Shut down hypochlorination unit H12 Refer to the applicable TM.