TM 10-4610-243-13
4-36.
TEE AND GATE VALVE ASSEMBLY (9114-Y1) REPAIR - cont.
(7) Connect plug (19) to female coupling (26) with ring (18).
(8) Position gasket (17) and gate valve (16) on tee (38).
(9) Install eight flat washers (15), screws (14), flat washers (13) lockwashers (12) and nuts (11).
(10) Position gasket (10) and male coupling (9) on gate valve (16).
(11) Install eight flat washers (8), screws (7), flat washers (6), lockwashers (5) and nuts (4).
NOTE
Ensure gasket is fully seated in groove of cap.
(12) Install gasket (2) in cap (3).
(13) Connect cap (3) to male coupling (9) with ring (1).
(14) Install tee and gate valve assembly in water system (para 3-4a).
(15) Startup water system (para 2-12c) and check tee and gate valve assembly for leaks.
4-37.
TEE AND GATE VALVE ASSEMBLY (9114-Y2) REPAIR.
This task consists of.
a.
Disassembly
b.
Cleaning
c.
Inspection
d.
Repair
e.
Assembly
INITIAL SET-UP:
Tools:
Material/Parts:
General Mechanics Tool Kit (Item 1, App B)
Detergent, General Purpose (Item 1, App E)
Vice (Item 2, App B)
Wiping Rag (Item 2, App E)
Equipment Condition:
Gasket (3) (Item 3, App I)
Tee and gate valve assembly removed (para 3-4a)
Gasket (4) (Item 10, App I)
Lockwashers (32) (Item 11, App I)
NOTE
Ensure that all parts identified as mandatory replacement parts are discarded and replaced with
new components.
a.
Disassembly. Refer to figure 4-33.
(1) Remove eight nuts (1), lockwashers (2), flat washers (3), screws (4) and flat washers (5).
(2) Separate male coupling (6) and gasket (7) from gate valve (13).
4-100