TM 10-4610-243-13
4-40.
INTERCONNECTION KIT MAINTENANCE.
The interconnection kit consists of the components listed below Refer to the following paragraphs for applicable
maintenance procedures.
Procedure
Para
Discharge Hose Repair .............................................................................................................................. 4-14
Tee Assembly (9115-Y) Repair .................................................................................................................. 4-41
Tee Assembly (9115-Y1) Repair................................................................................................................. 4-42
4-41.
TEE ASSEMBLY (9115-Y) REPAIR.
This task consists of:
a.
Disassembly
b.
Cleaning
c.
Inspection
d.
Repair
e.
Assembly
INITIAL SET-UP:
Tools:
Wiping Rag (Item 2, App E)
General Mechanics Tool Kit (Item 1, App B)
Tape, Anti-seize (Item 3, Appendix E)
Equipment Condition:
Gasket (2) (Item 4, App I)
Tee assembly removed (para 3-4a)
Gasket (3) (Item 10, App I)
Material/Parts:
Lockwashers (24) (Item 11, App I)
Detergent, General Purpose (Item 1, App E)
NOTE
Ensure that all parts identified as mandatory replacement parts are discarded and replaced with
new components.
a.
Disassembly. Refer to figure 4-38.
(1) Disconnect ring (1) from female coupling (9) and remove plug (2).
(2) Remove gasket (3) from female coupling (9).
(3) Remove eight nuts (4), lockwashers (5), flat washers (6) and screws (7) and flat washers (8).
(4) Separate female coupling (9) and gasket (10) from tee (29).
(5) Remove gasket (11) from female coupling (17).
(6) Remove eight nuts (12), lockwashers (13), flat washers (14), screws (15) and flat washers (16).
(7) Separate female coupling (17) and gasket (18) from tee (29).
(8) Disconnect ring (19) from male coupling (27) and remove cap (21).
(9) Remove gasket (20) from cap (21).
4-112