TM 10-4610-243-13
Table 2-1.
Operator Preventive Maintenance Checks and Services for Model WSDS-810 - cont.
Item
No
Interval
Location
Item to
Check/Service
Procedure
Not Fully Mission
Capable If:
63
64
65
66
67
68
69
70
71
72
73
74
During
During
During
During
During
During
During
During
During
During
During
During
Hypochlorination
Unit
Suction and
Discharge Hoses
Gate Valves
4-inch)
350 GPM Pump
125 GPM PUMP
CONNECTION KIT
(DISPENSING POINT)
Suction and
Discharge Hoses
Gate Valves
(2-inch)
Check Valve
125 GPM Pump
DUAL TANK
CONNECTION KITS
Suction and
Discharge Hoses
Tee Assemblies
Gate Valves
(4-inch)
50K Collapsible
Fabric Tanks
Perform "DURING" PMCS
contained in the applicable TM.
a.
Inspect hoses for leaks and
loose or unlocked couplings.
b.
Check hoses for kinks. Unkink
hoses.
Inspect for leaking valve stems.
Perform
"DURING"
PMCS
contained in the applicable TM.
a.
Inspect hoses for leaks and
loose or unlocked couplings.
b.
Check hoses for kinks. Unkink
hoses.
Inspect for leaking valve stems.
Inspect valve body for leaks.
Perform
'BEFORE"
PMCS
contained in the applicable TM.
a.
Inspect hoses for leaks and
loose unlocked couplings.
b.
Check hoses for kinks. Unkink
hoses.
Inspect tees for leaking gaskets.
Inspect for leaking valve stems.
Perform "DURING" PMCS
contained in the applicable TM.
Class III leak.
Class III leak .
Class III leak.
Class III leak .
Class III leak.
Class III leak
Class III leak
Class III leak
2-22