TM 10-8110-202-13 & P
Section VII. PREPARATION FOR STORAGE OR SHIPMENT
4-14. ADMINISTRATIVE STORAGE (45 days or less)
Administrative storage shall be in accordance with TM 740-90-1. It covers storage of equipment
which can be readied for mission performance within 24 hours.
Before placing item in administrative
storaqe, preventive maintenance checks and services (PMCS) should be performed, all known de-
ficien-ties corrected, and all current modification work orders applied. The administrative storage site
should provide required protection from the elements and allow access
applicable.
for visual inspection when
a.
b.
c.
d.
e.
f.
9.
h.
4-15.
Drain all water from drum.
Remove coupler valves from adapter assemblies.
Cover adapter assemblies with dust caps.
Place removed coupler valves in bags for protection.
Place drum and both coupler valves in shipping crate.
Check repair kit for missing parts. Replace missing parts.
Place a complete repair kit in shipping crate with drum.
Nail shipping crate cover onto shipping crate.
INTERMEDIATE AND LONG TERM STORAGE
No special procedures are required.
Follow administrative storage procedures in paragraph 4-14.
4-16. PREPARATION FOR SHIPMENT
When transporting the fabric drum with the yoke and/or tie-down kit, reference TM 10-8110-201-14 & P
for applicable procedures.
4-17/(4-18 blank)