Home
Download PDF
Order CD-ROM
Order in Print
ENGINE SOLENOID REPLACEMENT (cont) - TM-5-3895-370-14P_309
GAGE PANEL ASSEMBLY REPLACEMENT
TM-5-3895-370-14P Spreader Aggregate: Towed; 3 Ft Spread FF-8 (NSN 3895-01-329-5096) Manual
Page Navigation
293
294
295
296
297
298
299
300
301
302
303
TM 5-3895-370-14&P
4-67. SHUTDOWN SOLENOID REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's: automotive
TM or Para
Condition Description
Para 4-84
Negative battery cable
Wrench,
torque
disconnected.
Para 3-6
Rear engine panel
Materials/Parts
removed.
Tags, identification (item 52, Appendix E)
Preformed packing
a. Removal
NOTE
Tag and mark all wires before
removal.
(1)
Disconnect wire (1) from terminal lug (2).
(2)
Remove screw (3), washer (4), and terminal lug
(2) from shutdown solenoid (5).
(3)
Remove
shutdown
solenoid
(5)
from
fuel
injection pump (6).
(4)
Remove and discard preformed packing (7) from
shutdown solenoid (5).
b. Installation.
(1)
Install preformed packing (7) on shutdown
solenoid (5).
(2)
Install shutdown
solenoid
(5) on injection pump
(6). Tighten
solenoid
32 lb-ft (43 N
m).
(3)
Install terminal lug (2) with washer (4) and nut
(3) on shutdown solenoid (5).
(4)
Connect positive wire (1) on terminal lug (2).
NOTE
Follow-on maintenance:
·
Install rear engine panel (para 3-
6).
·
Install
negative
battery
cable
(para 4-84).
END OF TASK
4-160
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business