TM 5-3895-370-14&P(k)Install pipe (8) on two hose racks (11) withtwo u-bolts (10) and four locknuts (9).(1)Install adapter (7) on pipe (8).(m)If removed, install chain (6) and threerings (5) on reducer (3) and cap (2).(n)Install preformed packing (4) on cap (2).(o)If removed, install cap (2) on adapter (1).(p)Install cap (2) and adapter (1) on reducer(3).NOTEFollow-on maintenance:·Install gage panel support (para 4-156).·Install bituminous pipe heat shields (para 4-120).END OF TASK5-211
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business