TM 5-3895-370-14&P
2-26. FLUSHING THE BITUMINOUS SYSTEM.
a.
Introduction. Flushing procedures are to be performed before and after every operation cycle.
b.
Flushing Pump and Spraybar.
WARNING
Always use an assistant when disconnecting bituminous hoses that are hot or
filled with bituminous material or serious injury to personnel may result.
NOTE
·
It may be necessary to disconnect hoses before performing the following
procedures. Refer to para 2-16 for the proper and safe procedure to
disconnect bituminous hoses.
·
If flushing material was left in system overnight, proceed to step (2).
(1)
Connect hose (1) to inlet port (2) and outlet port (3) on distributor (4).
2-69