TM 5-3895-370-14&P
NOTE
Place a suitable container beneath
spraybar,
before
discharging,
to
collect all flushing material. Contact
your local environmental office or
support
installation
for
proper
disposal.
(13)
Using a suitable container, pull bar off/bar
spray lever (12) to the rear and discharge
all
flushing
material
from
bituminous
system.
(14)
When spraying is completed, move bar
off/bar spray lever (12) forward.
(15)
Reduce pump rate to 0 GPM by moving
pump transmission control lever (11) to
neutral and reduce engine RPM to 1200
with throttle control (13).
(16)
Perform Distributor Shutdown procedures
(para 2-27).
2-27. DISTRIBUTOR SHUTDOWN.
a.
Introduction. Distributor shutdown procedures
must be performed when distributor operations are
complete. Shutdown procedures are divided into tasks
performed when operations will resume the following
day, and after all operations are complete. Flushing
procedures (para 2-26) are always performed before
shutdown.
b.
Shutdown
Operations
Will
Resume
the
Following Day.
(1)
Shut off engine (para 2-14).
(2)
Park the distributor in a secure, level area.
NOTE
If work will continue the next day,
flushing material will remain in the
system overnight. Do not remove the
hoses.
(3)
Install control console cover (1) on control
console (2). Hook three latches (3) to
secure cover to control console.
2-73