TM 5-4320-301-13&P
TM 08936A-13&P/1
Section III
OPERATOR MAINTENANCE PROCEDURES (Contd.)
3-4. NOZZLE STAND ASSY INSPECT/REPLACE. (Contd.)
c. Using proper tools, straighten any bent legs or brackets. Weld any
minor cracks or breaks that were detected during inspection. Replace any
leg or bracket that is damaged beyond repair.
d. If either chain is damaged, cut a new one approximately 10-inches in
length from bulk chain (P/N RRC-271).
e. Replace any remaining parts that are damaged or defective.
Install serviceable stand assy into system.
3-5