TM 5-4320-301-13&PTM 08936A-13&P/1(3)Uncrating.Carefully uncrate equipment, being sure not to damage components. If the equipment is to berecrated, exercise care to prevent damage to crating material.(4)Unpacking.Unpack all small components packaged and stored around the larger components. Thesecomponents can easily be lifted and removed from the packing skid by two workmen.NOTEBe sure all components are accounted for. Check all packaging material for loose parts beforediscarding.(5)Servicing.Remove all protective compounds and covering such as waxed paper, waterproof tape, andbarrier material and tape. Using dry wiping cloths, remove all preservatives and greases from unpainted,threaded, or exposed surfaces.(6)Inspection.(a)Unwrap and examine separately wrapped items to ensure they are in serviceable condition.(b)Visually inspect all components for damage. Check for dents, cracks. broken parts, and loose or kinkedconnections. Report damaged items on DD Form 6, Packaging Improvement Report.(c)Check bill of lading to ensure that all parts have been supplied. Report all discrepancies in accordance withinstructions contained in PA PAM 738750.4-2.PREPARATION FOR USE.Prepare the equipment contained in the FAWPS systems for use as follows.NOTEDisregard instructions for equipment not contained in your particular equipment configuration.Refer to Appendix F.a.125 GPM Pump Assy.The 125 GPM pump assy consists of a 3-horsepower engine and a 125 GPM pump.(1)Prepare engine for operation in accordance with instructions in TM 5-2805-257-14 on Model WPSS100systems and in accordance with TM 5-4320-309-14 for Model 9095-91 systems.(2)Prepare pump for operation in accordance with instructions in TM 5-2805-257-14 On Model WPSS100systems and in accordance with TM 5-4320-309-14 for Model 9095-91 systems.b.500Gallon Water Drums. Prepare the 500gallon water drums for use in accordance with instructions continued inTM 10-8110-202-13&P.c.Kit, Valves, and Hose Assys. All kits. valves and hose assys are ready for use following uncrating. Do notremove the protective plugs and caps until installation. Ensure all valve assys are closed prior to installation in thesystem4-4 Change 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business