TM 5-4320-301-13&PTM 08936A-13&P/14-2.1 MOVEMENT OF FILLED DRUM BY CARGO TRUCK. A filled drum maybemoved short distances, at a speed not to exceed 10 mph (16km/hr), by towing with the towing andlifting yoke as shown in figure-4-3.Figure 4-3 Drum attached to cargo truck for towinga.b.c.Unfold the towing and Iiftng yoke and connect the two braces.Install the screws in the bracesPlace the shackles in the slots in the end of eack connecting leg and install each quick release pinin each connecting leg.d. Connect the towing and lifting yoke to the cargo truck pintle hook.e. When the drum has been towed to the new location, remove the towing and lifting yoke as follows:(1) Disconnect towing and lifting yoke from the cargo truck pintle hook.(2) Remove the quick release pin from each connecting leg and pull the shackles from the slots.(3) Remove the screws from the braces.(4) Seperate the two braces and fold the towing and Ming yoke.Change 54-5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business