TM 5-4610-228-13
TM 08846A-13/1
2-9.2 Set-up 40K WDS for operation as follows:
a. Position two 20,000 gallon tanks (see Goodyear Aerospace publication 5-19-19, dated 1981); tank should be
placed approximately as directed in figure on next page. A drain fitting is located in the bottom of the tank
directly below the discharge ports the tank. Remove the plug which is threaded into this drain. Retain this
plug for use during system disassembly. Attach the drain hose assy furnished with the tank to the drain
fitting. Run the drain hose assy out past the side of the tank so that free drainage will occur when tank is
emptied and before tank is refolded for repacking. Be sure that the gate wheel on the drain hose assy is
turned to the fully closed position.
If either a suction or discharge hose for the tank is ever detached, be sure to
seal the unconnected end of the quick-disconnect elbow with the plug which is
chained to the elbow. Failure to do so could permit contaminants to enter the
tank.
NOTE
Install all gate valves with control handles in upright and closed position.
b. Connect suction hose assy (2), to female side of 125 GPM pump assy.
c. Connect suction hose assy (2) to gate valve assy (3).
d. Connect suction hose assy (2) to reducer (1). Connect reducer (1) to water source.
e. Connect 125 GPM pump assy to discharge hose (4).
f. Connect discharge hose assy (4) to check valve (5). Connect check valve (5) to gate valve assy (3).
g. Connect gate valve assy (3) to discharge hose assy (4).
h. Connect discharge hose (4) to reducer (6). Connect reducer (6) to tee assy (7).
i. Connect tee assy (7) to discharge hose (8),
j. Connect hose assy (8) to discharge hose assy (9).
k. Connect discharge hose assy (9) to female end of gate valve and tee assy (10).
l. Connect hose assy (8) to water tank (13),
2-18