2-9.3 Set-up 300K, 1,000K WDS for operation as follows:
a. For the 300K WDS position the 16 each 20,000 gallon tanks in two rows (see Goodyear publications 5-19-12
dated 1981); tanks should be placed approximately as indicated on page 2-29. For the 800K WDS, consisting
of 16 each 50,000 gallon tanks refer to Uniroyal Manual CM63504-3-49. Be sure to leave about ten feet
between the two rows, and about five feet between each tank in the two rows to facilitate hose connection.
A drain fitting is located in the bottom of each tank, directly below the discharge port of the tank. Remove
the plug which is threaded into this drain. Retain this plug for use during system disassembly. Attach the
3/4-inch drain hose assy furnished with the tank to the drain fitting. Run the drain hose assy out past the
side of the tank so that free drainage will occur when the tank is emptied and before the tank is folded for
repacking. Be sure that the gate wheel on the drain hose assy is turned to the fully closed position. Perform
this operation for each of the tanks.
If either a suction or discharge hose for any of the 16 tanks is removed, be sure
to seal the unconnected end of the quick-disconnect elbow with the plug which is
chained to the elbow. Failure to do so could permit contaminants to enter the
tank.
NOTE
The tanks and attaching hardware shown in the following illustrations and
assembly instructions are only for assisting personnel in the set-up of the water
distribution system. If parts are damaged or require replacement, refer to TM
5-4610-228-23P.