TM 5-5430-211-13 & P5.Roll the tank off the crate base and onto the nylon webbing so that it is square with the prepared site and symmetrically placed over the nylon webbing.6.Roll the tank five feet into the prepared site.2-9
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business