CHAPTER 2.
PREPARATION FOR USE AND INSTALLATION
Section I.
SITE SELECTION AND PREPARATION
2-1.
SITE SELECTION.
Select or grade a level area of at least 38 x 34 feet;
this will provide the desired 5-foot perimeter around the empty flat tank.
If the site selected has a slight slope, place the tank side with the
drain fitting and a filler/discharge fitting at the lowest end. For best
tank operation, the tank bed area should have a slope of 3 inches in 100
feet.
Do not exceed 12 inches in 100 feet.
The site must not be subject
to flooding or high water.
Clear the site of all sharp objects that might
puncture or scuff the tank.
2-2.
DEPLOYMENT.
Place the crate containing the tank in the middle of the pre-
pared site.
Do not drop sharp objects on the tank.
Walk on tank as little as possi-
ble.
When walking on the tank, wear soft-soled shoes. Do not drive vehi-
cles over tank.
Failure to observe these precautions may results in punc-
tures, tears, or scuffs on the tank body.
Do not drop or strike tank fittings or accessories. All metal items are
aluminum and bend easily.
NOTE
Make sure that crated tank is in the proper position before beginning de-
ployment.
It is difficult to move tank once it has been deployed.
2-1