Table 4-1.
Inspection Procedures
ITEM NO.
ITEMS TO BE INSPECTED
PROCEDURES
1
Installation area
Inspect installation area. Re-
move sharp objects that might
cause punctures or leaks.
2
Tank Envelope
inspect tank envelope for tears,
punctures, and leaks. Refer to
paragraph
cedures.
4-8 for maintenance pro-
3
Vent assembly
Inspect vent assembly for damage
or leakage.
Inspect relief valve
for freedom of operation. Refer
to paragraph 4-9 for maintenance
procedures.
4
Filler Assembly
Inspect filler assembly for
damage or leakage. Inspect
gaskets for damage. Refer to
paragraph 4-10 for maintenance
procedures.
4-2