d.
350 GPM Pump Assembly ConnectIon Kt Assembly.
To prevent contamination of drinking water, make sure protective
caps and plugs are installed when components are not in use.
NOTE
Install all gate valves with hand wheel in upright position and valve fully
closed.
Suction hoses are noncollapsible and discharge hoses are collapsible.
(1) Connect suction hose (20 ft) (40) to suction side of 350 GPM pump assembly.
(2) Connect gate valve assembly (4) to suction hose (40).
(3) Connect tee (42) to gate valve assembly (41).
(4) Connect suction hose (20 ft) (43) to tee (42).
(5) Connect tee (44) to suction hose (43).
(6) Connect discharge hose (20 ft) (38) to discharge side of 350 GPM pump assembly.
(7) Connect gate valve assembly (37) to discharge hose (20 ft) (38).
(8) Connect discharge hose (39) to gate valve assembly (37).
(9) Connect tee (35) to discharge hose (39).
(10) Position hypochlorination unit near tee (35). Connect tee (35) to hypochlorination unit.
(11) Connect tee (34) to hypochlorination unit.
e. 125 GPM Pump Assembly Connection Kit Assembly
(1) Connect suction hose (20 ft) (29) to suction side of 125 GPM pump assembly.
(2) Connect gate valve assembly (28) to suction hose (29).
(3) Connect suction hose (20 ft) (27) to gate valve assembly (28).
(4) Connect reducer (45) to suction hose (27).
(5) Connect reducer (45) to tee (42) on 350 GPM pump connection kit.
(6) Connect discharge hose (20 ft) (30) to discharge side of 125 GPM pump assembly.
(7) Connect check valve (31) to discharge hose (30).
(8) Connect gate valve (32) to check valve (31).
(9) Connect discharge hose (20 ft) (33) to gate valve (32).
(10) Connect reducer (36) to discharge hose (33).
(11) Connect reducer (36) to tee (35) on 350 GPM pump connection kit.
(12) Connect discharge hose (26) from dual tank connection kit to tee (44). (See connection point
B-B.)
2-25