TM 10-3835-223-13&P
5-4. VALVE STATION REPAIR.
This task consists of:
a Disassembly
b. Cleaning
c. Inspection
d. Repair
e. Assembly
INITIAL SET-UP:
Tools rewired:
Tool Kit, General Mechanics, Automotive (Appendix B, Section III, Item 1)
Material Required:
Solvent, Dry Cleaning (Appendix E, Section II, Item 5)
Rag, Wiping (Appendix E, Section II, Item 4)
Equipment Condition:
Valve station removed from power pack (para. 4-17)
CAUTION
Mark and record location of all valves before removal. The three sandwich
valves look similar, but are set to different relief pressures. During
installation, do not exchange (mix up) the mounting position of these valves.
NOTE
Repair of the valve station is limited to replacement of control valves,
sandwich valves and manifold.
a.
Disassembly.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Remove four socket head nuts (19).
Lift control valve (17) and sandwich valve (14) from manifold (8). Remove retainer plate
(11) and four o-rings (10).
Remove four studs (18) from manifold (8).
Remove four socket head nuts (1).
Lift control valve (16) and sandwich valve (13) from manifold (8). Remove retainer
plate (5) and four o-rings (9).
Remove four studs (2) from manifold (8).
Remove four socket head nuts (3).
Lift control valve (15) and sandwich valve (12) from manifold (8). Remove retainer
plate (6) and four o-rings (7).
5-8