TM 10-3835-223-13&P2-7. OPERATING PROCEDURES - cont.(18)(19)(20)(21)(22)(23)(24)(Ground Crew) Position hose at angle to reel spool so that hose will wind in a spiral towardopposite reel hub. Continue to wrap hose toward opposite hub.Repeat steps (15) through (18) until reel is full or hose end is within ten feet of reel.(Ground Crew) Slowly wind remaining hose onto reel.(Operator) Stop reel when hose end is positioned under roller by releasing RUN switch.(Ground Crew) If hose is loose, tie hose end to hose reel with string.Make sure fold inhose end is secure.(Operator) Apply brake lever. Tighten brake adjusting knob as required to prevent reelfrom turning.(Operator/Ground Crew/Vehicle Operator) Repeat steps (5) through (23) for other hosereel. Set REEL CCW/CW switch to OFF when complete.NOTEOne power pack is supplied for use with six hose reel frame units. Power packmust be installed to make reels operational. Operating instructions are thesame for all six frame units.(25)Remove power pack from frame unit and install in empty frame unit (para. 2-6a).(26)Repeat procedures for all deployed hose.2-22
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business