TM 10-4130-237-14
5-22.
EVAPORATOR REPLACEMENT (CONT)
16 Set water chiller on skid base.
17 Add oil (para 3l).
NOTE
If any refrigeration system components have been removed or replaced, in-
stall a new filter-drier before evacuating system (para 519).
18 Leak-test system (para 5-7).
19 Evacuate system (para 5-9).
20 Charge system (para 5-9).
5-23.
RELIEF VALVE REPLACEMENT
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment
Condition
P a ra Condition Description
Tools
5-2
Engine stopped, power
Common No. 1 Organizational
disconnected, muffler
Maintenance Automotive
and housing removed.
Maintenance and Repair Shop
Eqpt, item 2, appendix B
3-1
Engine oil drained.
Materials/Parts
Polyurethane foam, item 13,
appendix E
Solder, item 19, appendix E
5-74