TM 10-4130-237-14
5-24. THERMOSTATIC VALVE REPLACEMENT (CONT)
INITIAL SETUP
Equipment
Condition
Para Condition Description
5-2
Engine stopped, power
disconnected, muffler
and housing removed.
3-1
Engine oil drained.
TOOlS
Common No. 1 Organizational
Maintenance Automotive
Maintenance and Repair Shop
Eqpt, item 15, appendix B
Materials/Parts
Polyurethane foam, item 13,
appendix E
Solder, item 19, appendix E
a. R e m o v al
1
Set water chiller on its side.
2
Remove 16 bottom plate mounting screws. Remove bottom plate.
3
Break up foam around thermostatic valve.
5-77