TM 10-4130-237-14
Section II. SERVICE UPON RECEIPT
4-4.
UNPACKING AND INSPECTION
a. General. The basic water chiller, support kit, and trailer mounting kit are crated and shipped as one item. Support
kit and trailer mounting kit are boxed together on top of the water chiller.
b. Unpacking the Water Chiller
1
2
3
4
5
Place crated unit as close as possible to point of use.
Remove steel bands from top of crate, being careful not to damage water chiller components.
Remove cardboard box containing kits from top of water chiller. (Instructions are also on box.)
Open cardboard box and remove contents.
Inspect all contents for damage.
The cardboard box contains a duffle bag for storing components of support kit after
removal from packing box. Select components required for installation from support
kit. Store spare support kit components in duffle bag for later use.
Check contents using appendix C, Components of End Item and Basic Issue Items
Lists.
6 Cheek support kit contents. These items are required for setting up water chiller as operational unit.
7 Check contents of trailer mounting kit. Do not remove from shipping ease until ready for installation.
8 Remove crating from around water chiller and remove hold-down bolts from skid base.
9 Remove water chiller from crating and place at point of operation.
4-3
