TM 10-4320-345-13
2-16. PREPARATION FOR MOVEMENT - cont.
(27) Push up on toggle levers (19) and lock retaining brackets (18) against metal rims (15).
(28) Repeat steps (17) through (28) until entire hose length
(1000 feet) has been packed in flaking
box.
(29) Remove pullboard (11), hoist (12) and retaining brackets (18) from flaking box (14).
(30) Remove nut (1, figure 2-34) and eyebolt (2) from front wall of flaking box (4).
Install Tailgate. Refer to figure 2-39.
(31) Slide tail gate (1) down into flaking box (2). Make sure notches (3) at bottom of tail gate aline
with studs (4) in flaking box.
(32) Install two thumbscrews (5) through flaking box (2) and into tailgate (1). Make sure thumbscrews
are tight.
WARNING
To prevent injury to personnel and damage to the equipment, do not stack flaking boxes more
than four high.
(33) Repeat steps (1) through (32) until all hoses have been packed.
Figure 2-39. Tailgate Installation.
2-88